Main | Las Vegas »
Friday
Nov112011

Las Vegas Reception Desk

This project was successfully installed in October, 2011 in Las Vegas, Nevada.  Measuring nearly 14ft in length and 6ft in breadth it weighs upwards of 600 lbs when fully assembled.  Despite it's size and apparent complexity it was designed to be assembled in less than 30 minutes by three men.  

I shipped it in three components, two large cabinets and the roulette wheel.  All in all it was a heavy piece, but; I felt shipping it in this manner made for an easier install. Installs are always the most stressful aspect of any job. Being 1700 miles from the home base meant we had to have not only a good plan, but a well designed piece. From arrival and unpacking to final once over we spent two hours tweaking this piece into position.  

I'm uploading images of this piece onto the website next week.  In the meantime you can see pictures of it on my flickr page.  Let me know what you think!  Follow this link for images:  USM Reception Desk

Stephen

PrintView Printer Friendly Version

EmailEmail Article to Friend

Reader Comments

There are no comments for this journal entry. To create a new comment, use the form below.

PostPost a New Comment

Enter your information below to add a new comment.

My response is on my own website »
Author Email (optional):
Author URL (optional):
Post:
 
Some HTML allowed: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <code> <em> <i> <strike> <strong>